We can design, specify, integrate, install and maintain the entire chain — so responsibility never gets lost. We manufacture switchboards in-house.
For every site we assign a project manager, a site manager, foremen and — when the design keeps changing — a designer. They have the authority to decide on site, instead of coordinating between departments back at the office. That is how we handle projects with a lot of integration, coordination and change.
Coordination, calculations, client communication — one accountable person.
Execution on site, schedules, quality.
Installation crews and their pace.
Changes and drawings during the works, not after them.
Decisions are made on site. Fast, efficient — and the construction process runs noticeably smoother, especially where the design changes along the way.
Decisions are made in-house — and so is the responsibility for them.
We design in-house — from grid connection terms to full integration of the electrical scope into the production process. The design team works alongside project managers, so decisions never get lost between contractors.
The design changes. The deadline doesn't.
Large-scale electrical and low-current systems for buildings — from premium real estate to airport terminals. At the start of construction we have one client. At handover there can be several hundred — apartment buyers' changes and individual solutions are part of the process, not an obstacle.
Our work is integrated into the validated room's project — validation itself is performed by specialised partners. Sites: Thermo Fisher Scientific, BIO CITY II and III (Celltechna), Metrosert — with laboratory contractor Biotecha.
Your site gets power sooner.
Three reasons we get hired: EV infrastructure scale, fast-track DSO connections, and delivery speed.
At opening — the largest EV charging park in the Baltics: 20 stations · 40 cars at once · 1.5 MW.
Own facility in Vilnius. Every board tested before dispatch.
We manufacture distribution, control and compensation boards ourselves — so deadlines and quality are controlled, not negotiated.
We measure first. Then we choose the equipment.
Reactive power compensation and harmonic filtering for industry. Reactive power charges reduced by up to 97%.
We often arrive to fix one problem. We stay to maintain the whole system.
We came to fix a constantly false-alarming fire alarm system that kept stopping the plant and forcing evacuations. We fixed it. Today, for ~5 years, we've maintained all their electrical systems, monitoring and power quality equipment.
Full story →Commissioning support → active harmonic filtering → solar plant before the factory opening.
VIGO case — power quality →