LT EN
Engineer site team
Engineer · Lithuania · since 1995

When power is critical, capacity is the constraint.

Engineer is one of Lithuania's largest electrical contractors — 270+ people, our own switchboard factory, and three times last year's volume. We design, build and maintain power infrastructure for airports, defence, life sciences and data — and we are building the capacity for the next build cycle across the Nordics and Germany.

Figures as of November 2026
270+People · only 16 in administration
3×Growth in one year · €5.8m → €16.2m (2026 forecast)
€32mContracts in progress · largest €7.5m
19Active sites · 3 above €3m
0Serious workplace accidents · since 1995
ISO9001 · 14001 · 45001 · certified 2026
83%Revenue from returning clients
31Years in business · three generations in energy
Why now

Defence pulled us forward. The system stays.

Lithuania is building at a pace it has not seen in decades — ammunition production, a permanent base for an allied brigade, energy security. We deliver the electrical scope on two of the country's largest military sites. That demand tripled our organisation in a single year.

What we built to get there — a hiring engine, supervision structure, factory capacity and site control — is what we bring to the next programme.

2017

First project abroad — a clinic in Germany.

2024

Era of large sites. Vilnius Airport T4 — then a record contract, today a typical one.

2025

Power quality division — harmonic filtering, reactive power compensation, monitoring.

2026

Defence programmes, 3× growth. Ammunition plant and Rūdninkai military town. ISO 9001, 14001 and 45001 certified.

Scope

Electrical packages, delivered by one accountable team.

We take a defined electrical scope and own it — people, supervision, materials, testing and documentation — so you manage one interface, not a crowd of individuals.

01

LV installation

Power distribution, cabling and containment, lighting, small power, fire alarm and low-current systems — installed by our own supervised crews.

02

Switchboards from our factory

LV switchboards built and factory-tested in Vilnius before dispatch (IEC/EN 61439). Fewer hours on site, more control over quality and schedule.

03

MV and grid connections

Outdoor networks, transformer substations and cable lines; fast-track grid connections built to the developer's schedule.

04

Critical power and power quality

UPS, voltage conditioning, harmonic filters and SVG reactive power compensation. We measure first, then specify.

05

Design and BIM

In-house design team working in BIM, Dalux and Trimble — shop drawings, coordination and redesign while construction runs.

06

Testing, commissioning, maintenance

Testing and commissioning support, handover documentation and long-term maintenance of the systems we build.

How we work

One package — one dedicated team.

Every package gets its own team with authority to decide on site. That is how we handle projects where the design changes while the deadline does not.

PROJECT MANAGERSITE MANAGERFOREMENDESIGNER

Our own supervision

Site managers and foremen are Engineer staff. Productivity, quality and safety are managed by us, inside your site rules.

Scale on demand

Peak teams grow from our installer base and long-term partner crews working to Engineer standards, under our supervision.

Speed when it counts

Planned shutdowns compressed into weekends: substations replaced, whole buildings cabled, floors installed before the concrete pour.

Safety record

Zero serious workplace accidents since 1995. Internal inspections plus independent audits by a specialised OHS firm.

Track record

Sites where failure is not an option.

Rūdninkai military town — model
Defence

Two of Lithuania's largest military sites

An ammunition plant — outdoor and indoor electrical networks and fire alarm. Rūdninkai military town for the German brigade — design and build, complete electrical scope.

Design & buildComplete electrical scopeIn progress
Vilnius Airport T4 departure terminal
Aviation

Vilnius Airport, T4 departure terminal

Full electrical scope of a new terminal at an operating airport. The design kept changing during construction — the opening date did not.

13,000 m²Handed over 20254 months early
Cleanroom laboratory
Life sciences

Cleanrooms in Lithuania and Estonia

Electrical infrastructure for controlled environments — backup and uninterruptible power, routing coordination, documentation up to qualification. Thermo Fisher Scientific, BIO CITY II and III, Metrosert in Tallinn.

Third project with BiotechaCross-border
Jonavos Grūdai grain elevator
Industry

Jonavos Grūdai — a substation in a weekend

One of the largest grain elevators in the Baltics. A month of preparation, one weekend of work: old supply off on Friday, new substation and switchgear running on Monday.

10-year partnership3 stagesWeekend switchover

Also: Baltneta data centre and network infrastructure · Continental plant design · Kaunas Akropolis 1.5 MW EV hub · all projects →

Reach

One time zone from Helsinki. Two hours from Frankfurt.

Helsinki1 h 15Stockholm1 h 30Oslo1 h 50Copenhagen1 h 35Berlin1 h 35Frankfurt2 h 15VILNIUS
1–2 hDirect flights from Vilnius to Helsinki, Stockholm, Copenhagen, Berlin, Oslo and Frankfurt.
EETSame time zone as Finland; one hour ahead of Sweden, Norway, Denmark and Germany.
Road & seaFerries from Klaipėda to Sweden and Germany; Berlin is about 1,000 km by road — crews, vans and prefabricated equipment travel overland.
EUAn EU employer. Posting rules — A1 certificates, host-country pay and conditions — applied as standard.
Talk to us

Come and see it in Vilnius.

One day: our switchboard factory, two live sites and the team that runs them. We will show you how a package would run on your programme.

Founder & CEO
Office
Addresses
Savanorių pr. 178A, Vilnius — office
Plungės g. 4, Vilnius — factory