Lower reactive power charges. Fewer unexplained trips.
Engineer measures your site, finds the cause and installs the fix — SVG reactive power compensation, active harmonic filters, hybrid systems, voltage conditioners and UPS. We measure first. Then we choose the equipment.
If one of these sounds familiar, measure before you buy.
Reactive power on the bill
Penalties every month, even with a capacitor bank installed — or because the old one no longer keeps up with the load.
→ SVG or hybrid compensationTrips nobody can explain
Breakers tripping, transformers and cables running hot, drives and PLCs faulting — often harmonics from frequency converters.
→ Active harmonic filtersLines stopping on dips
A voltage sag lasting a fraction of a second stops a whole line and its restart costs hours.
→ Voltage conditioners, UPSCapacitors failing early
Fuses blowing and capacitors swelling — resonance between the bank and harmonics in the network.
→ Detuned or hybrid systemsChosen from your load profile, not a catalogue.
SVG — static var generators
Real-time compensation of inductive and capacitive reactive power and phase imbalance. Modular — the system grows with the plant.
Catalogue (PDF) ↓Active harmonic filters
For sites with frequency converters, welding, UPS and other non-linear loads. Compensation follows the load as it changes.
Catalogue (PDF) ↓Hybrid compensation
Capacitor banks take the bulk, the SVG handles fast changes. We can also upgrade your existing capacitor system instead of replacing it.
Catalogue (PDF) ↓Active voltage conditioners
Ride-through for voltage sags, swells and short interruptions, with energy stored in supercapacitors.
Catalogue (PDF) ↓UPS
Stable, uninterrupted power for critical equipment, with smart battery management.
Catalogue (PDF) ↓Energy monitoring
Consumption, loads and grid parameters in one browser interface. Local data storage — no monthly cloud fees.
Full catalogue (PDF) ↓We are not tied to one manufacturer — the solution follows the measured profile and its payback.
Problem. Solution. Result.
Nemuno banga
Reactive power charges and unstable compensation. 2 × 180 kVAr hybrid compensation cut the charges by up to 97% — and grew into maintenance of the whole plant's electrical systems.
VIGO Engineering
THDi of 30.6% and 65.3% on two feeders: overheating and nuisance trips. 600 A of active filtering sized from measurements brought both to about 10%.
Grigeo Tissue
High-power production lines beyond what single filters could handle. 22 active filters of 200 A each in one coordinated system.
Eternit Baltic
“Not everything old needs replacing.” The existing contactor cabinets stayed; SVGs were integrated into them and the system became hybrid — the result at a lower cost.
More cases: Umaras, Kalnapilis, Vaškai Biomethane, Steka · power quality in detail →
From measurement to payback in numbers.
1 · Measure
Our engineers measure on site with our own analysers — load profile, harmonics, peaks, voltage events.
2 · Calculate
You get the cause, the solution and its payback period in euros — for your site and your tariff.
3 · Build and install
Cabinets are assembled and tested in our Vilnius panel shop, then installed with minimal disruption to production.
4 · Monitor
Monitoring, periodic measurements and maintenance — so the result stays on the bill.
A power quality team with a 270-person contractor behind it.
Measurement equipment and engineers — no subcontracted audits.
Panel shop in Vilnius — cabinets built and tested before they leave (IEC/EN 61439).
If the switchroom needs more — rebuild, new feeders, a full plant fit-out — we are an electrical contractor with 270+ people, ISO 9001, 14001 and 45001.
Already working in Estonia (Metrosert, Tallinn). Riga is about 300 km from Vilnius, Tallinn about 600 km.
Send us your electricity bill. We will tell you what it hides.
A first look at your bill and single-line diagram costs nothing. If measurements make sense, we come to your site.
kestutis.gedminas@engineer.lt
aurimas.kulokas@engineer.lt